top of page
YOLCULUKLAR.jpg

Every project is part of a journey and goal achievement. Discover your paths, step into success and go beyond the route!

ARMCO

Projects

WHO WE ARE

Meet the Founders

This is the space to introduce the team and what makes it special. Describe the team culture and work philosophy. To help site visitors connect with the team, add details about team members' experience and skills.

SARAH SUAREZ

CEO

This is the space to introduce the business's team and what makes it special.

MIKE DENG

VPE

This is the space to introduce the business's team and what makes it special.

REAY FINIGAN

CTO

This is the space to introduce the business’s team and what makes it special.

PRESS

Volaso in the News

This is the space to introduce visitors to the business or brand. Briefly explain who's behind it, what it does and what makes it unique. Share its core values and what this site has to offer.

Başkentray Signaling Project

The scope of the project includes 36 km line length, 150 km rail length and signaling and telecommunication system for 24 stations.

Isparta - Burdur -Denizli Project

It is the work of installing and carrying out signaling and telecommunication systems at train speeds up to 160 km/h on the 234 km long railway line section with 21 stations between Isparta - Burdur - Denizli, using TÜBİTAK-BİLGEM interlocking.

Çerkezköy - Kapıkule Signalization Project

The 152km long double track high speed train line between Çerkezköy - Kapıkule stations will have an operating speed of 200km/h and ETC5 L1 (can be upgraded to L2) systems.

Sirkeci-Kazlıçeşme Project

8.3 kilometers of idle land between Sirkeci and Kazlıçeşme on the historical peninsula.
long railway line, required infrastructure and superstructure, with Kolin as the main contractor.
It was reopened for use after improvements were made.

Başkentray Signaling Project

The scope of the project includes 36 km line length, 150 km rail length and signaling and telecommunication system for 24 stations.

Kayseri Anafartalar YHT Line Project

Within the scope of Kayseri Anafartalar YHT Line Project, signaling and telecommunication works of the 6+700km long urban line were carried out.

Başkentray Signaling Project

The scope of the project includes 36 km line length, 150 km rail length and signaling and telecommunication system for 24 stations.

Kayseri Northern Passage Project

The scope of the project includes 60km rail length and 26km line length.

The renovation of 3 local desks and a control center controlling the route between Ankara and Sivas is also included in the project.

Malatya Hekimhan Sayding Project

The scope of the project includes converting a junction line on the main line into sayingding and making the switches in this direction remote controlled. 

Çayyolu Warehouse Signalization Project

The scope of the project includes 18 parallel warehouse lines with a rail length of 10 km. Within the scope of the project, 2 redundant control centers, 40 switch motors and axle counters were used.

bottom of page